Shed construction continues, slowly

| No TrackBacks
Haven't made any updates in a while, but the shed is still being worked on.  We got the roof built and sheathed, put tar paper up on the roof and walls, installed the window, and have installed wall sheathing on two walls.  There are some rain storms coming through this week, and this weekend is full of other things, so hopefully we'll finish the walls and door the following weekend.  After that, shingles and paint, then we can start storing things!

(Sorry, no pictures this time around)

No TrackBacks

TrackBack URL: http://blogs.halibut.com/mt/mt-tb.cgi/383

About this Entry

This page contains a single entry by Nick published on January 18, 2010 5:49 PM.

Walled in was the previous entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

Powered by Movable Type 4.3-en