Walled in

| No TrackBacks
This weekend, my dad came down and we framed out the walls of the shed.  It went surprisingly quickly, actually, despite a small snag...the 2x4s that I thought were a full 8' long were actually 92.25" long, cut for wall stud members (to make for an 8' interior wall when top and bottom plates and drywall for the ceiling are taken into account).  I had planned to cut the wall studs down to make for about a 7.5' high wall, so that wasn't too much of a problem, but we did need 8' lumber for top and bottom wall plates.  My dad ran off and picked up enough 8' lumber, while I started preparing measurements.  We decided to just leave the 92.25" studs at that length to save time, and after triple-checking measurements, cutting the framing members for the door and window, and judicious application of the pneumatic nail gun, we had four walls raised.  Even putting just a few hours here and there into it, this sort of project does not take very long...I can't imagine spending several thousand dollars on a prefabricated shed at this point, especially since the ones I've seen don't seem to be of particularly good build quality.  We've spent an order of magnitude less, will have a nice very sturdy shed, with a real weatherproof door and window.  I'm looking forward to the next build day!

Pictures follow...









No TrackBacks

TrackBack URL: http://blogs.halibut.com/mt/mt-tb.cgi/367

About this Entry

This page contains a single entry by Nick published on November 17, 2009 5:31 PM.

Shed foundation was the previous entry in this blog.

Shed construction continues, slowly is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

Powered by Movable Type 4.3-en