Shed foundation

| No TrackBacks
With the help of my dad, the concrete piers for the shed were placed and leveled, and the floor frame was laid on the piers and nailed to the straps.  The plywood floor is shown sitting on top, but has not yet been attached, as I bought the wrong kind of caulk.  I'll hit up the hardware store and get the plywood glued and nailed down, then I'll start on the wall framing.

Pictures follow...
















No TrackBacks

TrackBack URL: http://blogs.halibut.com/mt/mt-tb.cgi/365

About this Entry

This page contains a single entry by Nick published on November 8, 2009 3:39 PM.

Musings on DIY amplifiers was the previous entry in this blog.

Walled in is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Categories

Pages

Powered by Movable Type 4.3-en